When are footings to be inspected?
All footings, including poles and piers, shall be inspected when the excavating is complete and all required forms and/or reinforcing steel is in place prior to placing of concrete.

Show All Answers

1. When is a building permit required?
2. How much does a permit cost?
3. How long does it take to process a permit?
4. Do I have to remove old layers of roof material when I am applying a new roof?
5. When does a structure require footings?
6. When are footings to be inspected?
7. Do I need a permit to perform electrical services in my own home?
8. If the City issues me a building permit, but the Building Inspector finds violations when performing an inspection, does having a permit make those violations allowable?
9. How soon must I begin work once I have received a permit?
10. When is it required to have building plans and drawings stamped by an engineer or architect licensed in Nebraska?
11. When are emergency egress windows required in single family homes?